Inside 361: Overcoming Challenges

Inside 361: Overcoming Challenges

The team prepares to ship prefabricated boilers to a school in this episode of Inside 361.

Building the heating and hot water system at the 361 Degrees headquarters presents logistical challenges, but makes a big difference to the client.

Once the prefabricated heating and hot water system is ready to go, the team brings in a specialist haulage company to transport it safely to the south coast. A team of 361 Degrees engineers meets it at the other end and all the groundwork makes for a straightforward installation.

Learn more about how we create tailored heating systems for schools.

Get in touch
Scroll to top